Active Vehicle Barrier Installation
Active Vehicle Barrier Installation
Fortified Electrical Infrastructure for Fort Sill, OK Military Base
Project Overview
Precision & Protection at a Strategic Entry Point
J2 Company was selected as the design-build electrical partner for a high-security access control upgrade at Fort Sill’s Apache Gate. Working under USACE, our team delivered a full-scope electrical installation of four certified K12/M50-P1 rated denial open frame wedge barriers, integrating power infrastructure, control systems, safety components, and low-voltage technology to secure Military Access Control Points.
The project required seamless coordination of design, construction, and system integration. J2 provided engineering support, load calculations, and electrical schematics to guide the electrical system design and installation. From conduit and wiring to barrier programming and alarms, every element was executed in strict accordance with USACE and military standards.
Scope of Work
Barrier Infrastructure & Foundation
- Excavation for wedge barrier foundations
- Installation of rebar and concrete for barrier bases
- Placement of concrete from foundation through finished roadway
- Concrete pads for Electronic Power Units (EPUs)
Electrical & System Integration
- Conduit, wiring, and electrical connections from each barrier to its EPU
- Power distribution to entire AVB system
- Installation of lighting, signage, poles, signals, and audible alarms
- Low-voltage wiring and fiber optics for full control system connectivity
- Drainage installation to support long-term system performance
Controls & Technology
- Programming and operational setup of control panels
- Overspeed and wrong-way vehicle detection systems
- Installation of quadrupole inductive loops for vehicle detection
- EFO (Emergency Fast Operation) control panels at guard booths and overwatch pads
- Doppler radar installation for Overspeed and Wrong Way Detection System
- Master control panel installation in prefabricated command and control booth
Results
- All wedge barriers installed with full functionality
- Electrical systems tested and verified for reliability under operating conditions
- Integrated control panel programming with EFO response and traffic detection
- Successfully completed as part of a collaborative design-build effort with USACE
- Successful Performance Verification Test (PVT) with recognition from USACE on professional and knowledgeable on-site team
- Full acceptance by Fort Sill with a Zero Punch List sign off at project completion
Let’s Build What’s Next
Looking for an experienced electrical partner for your secure infrastructure or defense facility? J2 Company delivers precision electrical work and systems integration on time, on spec, and to the highest standard.


