J2 Company, LLC designed, engineered, and installed new electrical systems to integrate into existing 1960 era ITE switch gear. This included 480v main circuit breakers – 400 amp and 250 amp. J2 Company was required to retrofit refurbished circuit breakers with bus shoes to integrate to existing switch gear. J2 Company ran over 20,000’ of new conduit and wiring. J2 Company installed multiple new transformers, switch gear, MDP, and NEMA 3R and NEMA 12 panels on the exterior of a concrete structure to provide proper installation of the new electrical system.
Relevance to this Proposed Work
- Retrofit of 1960’s era electrical equipment – ITE and others.
- Engineering to support retrofit efforts.
- Integration of new electrical components to 1960’s vintage electrical devises and equipment.
- Sourcing of vintage electrical devices including high amperage circuit breakers.
- Retrofit of existing switchgear to work with new or refurbished components.
Point of Contact
Owner POC:
Zack Cornelius
Director of Operations
Daybreak Suites
(404) 277-9788
Zack.Cornelius@daybreaksuites.com
Prime Contractor
Courtney Dimery – Project Administrator
Ph: 731.787.7615
Fx: 888.400.5523
officeafconstruction@gmail.com
Chris Williamson – President
Ph: 731.694.0122
www.afconstruction.net